202506-30Technical requirements for desulfurization baffle doors
The smoke barrier door adopts a single axis electric double-layer louver double barrier structure. The smoke baffle door has 100% tightness (with air seal) at t
-
202506-30Introduction to the Performance of Vapor Liquid Two Phase Flow Hydrophobes
Currently, most of the products used are mechanical floating ball, electric, and pneumatic. These products not only have high costs and complex controls, but al
-
202506-30Test and requirements for built-in headless deaerator
1. Material testing:
The materials should be based on
a) JB4730-1994 "Magnetic Particle Inspection of Steel Pressure Vessels"
c) GB/T228-2002 "Tensile Test Meth -
202506-30Technical specification for flue gas desulfurization baffle door
Technical specification for flue gas desulfurization baffle door
1. Overall system requirements
1.1 This flue gas desulfurization system requires 4 sets of fl -
202506-30Technical specification under JB10992-2020-T "Wet flue gas desulfurization equipment - flue gas
JB10992-2020-T "Wet flue gas desulfurization equipment - flue gas damper door" standard technical specification
1. The smoke baffle has 100% tightness at the de -
202506-30Working principle of vacuum deoxygenation
The working principle of vacuum deoxygenation is to apply Henry's law and Dalton's law. According to Henry's law, in a closed container, if any gas