202506-30
Troubleshooting of Vacuum Deaerator
1. The vacuum degree cannot be drawn high
The higher the vacuum degree, the better the deoxygenation effect. Therefore, the deoxygenation head should maintain t -
202506-30
Efficient and emission free rotary film deaerator
In the thermal cycle of thermal power generation, condensed water and desalinated water are heated and deoxygenated by a deaerator, and then discharged into the
-
202506-30
Technical requirements for desulfurization baffle doors
The smoke barrier door adopts a single axis electric double-layer louver double barrier structure. The smoke baffle door has 100% tightness (with air seal) at t
-
202506-30
Introduction to the Performance of Vapor Liquid Two Phase Flow Hydrophobes
Currently, most of the products used are mechanical floating ball, electric, and pneumatic. These products not only have high costs and complex controls, but al
-
202506-30
Combination automatic dosing device
overview
The combined automatic metering and dosing device includes automatic or manual, large volume metering box or small volume metering box, single or doub -
202506-30
Phosphate dosing device
1、 Process principle of phosphate dosing device
The hardness of calcium and magnesium in boiler feedwater can undergo chemical reactions or concentrate and cry -
202506-30
Main purpose of safety valve muffler
The new exhaust valve safety valve exhaust muffler adopts the principle of spray impedance composite noise reduction, in which a large hole expansion is used in
-
202506-30
Tianlong Liquor Industry Expansion Container Waste Heat Recovery Renovation Plan
1、 Overview
The exhaust of equipment such as deaerators, expansion tanks, and drain tanks inevitably carries a certain amount of water vapor, especially the e -
202506-30
Test and requirements for built-in headless deaerator
1. Material testing:
The materials should be based on
a) JB4730-1994 "Magnetic Particle Inspection of Steel Pressure Vessels"
c) GB/T228-2002 "Tensile Test Meth -
202506-30
Technical specification for flue gas desulfurization baffle door
Technical specification for flue gas desulfurization baffle door
1. Overall system requirements
1.1 This flue gas desulfurization system requires 4 sets of fl