1、 Overview of desulfurization baffle door products
The desulfurization baffle door is produced and manufactured by Lianyungang Huaneng Power Auxiliary Equipment Co., Ltd. with independent intellectual property rights. It is used on the inlet, outlet or bypass flue of the flue gas system absorption tower, or in the flue gas denitrification and dust removal system. The desulfurization baffle door usually adopts a louver type double-layer baffle structure. When closed, sealed air is introduced between the double-layer baffles for gas sealing, achieving the function of isolating and shutting off the flue gas.

                           Sealing principle diagram of baffle door 

The sealing material of the desulfurization baffle door is made of specially treated alloy sheets, which have stronger elasticity and self-cleaning function. The passive enhanced sealing structure fully ensures that the gap between the sealing sheets is minimized, which can effectively ensure zero leakage of the equipment for a long time. Assist in the design of the quick opening mechanism to reduce the starting torque, making the quick opening device safer and more reliable. A reliable welding process can ensure that the weld seam has the same anti-corrosion life as the material body. The mechanical linkage control of the air seal valve is safe and reliable.

2、 Technical parameters of desulfurization baffle door
1. Flue section: W (width) x H (height) x L (thickness);  
2. Applicable medium: cold and hot flue gas;  
3. Design temperature resistance: ≤ 300 ℃;  
4. Design pressure: ± 8500Pa;
5. Leakage rate of smoke inside and outside: "0"
6. Drive mode: electric or pneumatic;  
7. Power and control requirements: to be selected by the user.  

3、 Performance characteristics of desulfurization baffle door
1. The desulfurization baffle door adopts a single axis driven double louver baffle structure, and a sealed chamber for introducing sealed air is designed in the middle of the double-layer blades. The sealed air above the flue gas pressure is introduced into the baffle, forming a sealed air isolation layer between the double-layer baffles to block the passage of flue gas flow.  
2. The opening and closing time of the desulfurization baffle door is ≤ 45S (can be selected according to user requirements).  
3. The external design has a connecting rod mechanism that allows several blades to open or close synchronously. The shaft seal device is separated from the rolling bearings, making it easy to adjust and maintain without bearing corrosion concerns.  
4. The design structure of the double louvered desulfurization baffle door is reasonable, with good blade rigidity and stable and reliable operation. The sealing type of the louvered baffle blade is elastic seal or gas seal.  
5. The desulfurization baffle doors produced by Huaneng Power Auxiliary Machinery can be driven in multiple ways: electric or pneumatic.
6. The air seal fan and door panel are controlled by a mechanical linkage mechanism, which is safe and reliable.
   Desulfurization baffle door
4、 Supply scope of desulfurization baffle door
Including the damper body, sealed air inlet valve, driving device (electric or pneumatic device) and other accessories, the sealed fan can be supplied as a complete set.

5、 Common specifications and models


 

      

                             *Customized according to user requirements for specified sizes! At present, our company's maximum manufacturing performance size is 9 meters by 12 meters

 

        Dimensional drawing of baffle door

6、 Ordering instructions for desulfurization baffle door:
1. Provide flue interface size _________mm × _________mm
2. Installation direction of pipeline: width _________mm, height _________mm, thickness _________mm;
3. Smoke parameters: temperature _________℃ pressure _________Mpa medium_________;
4. Requirements for opening and closing time_________;  
5. Connection method: flange flat butt welding connection □ flange bolt connection □;  
6. Material requirements (sealing plate: nickel based alloy _________ or acid resistant stainless steel_________) (door panel: carbon steel _________or carbon steel lining_________)
7. Operation mode: Electric (brand and other requirements) □_________; Pneumatic (brand and other requirements) □_________; Manual □;  
8. The purpose and position of the air damper in the pipeline_________;

     Screen door picture    Chimney baffle door

Photo of the barrier door

 Picture of chimney baffle door

 


 

Related products:

slide plate gate

damper

flap gate

explosion vent

Electric plug-in door

Hot air isolation door

Desulfurization baffle door

Smoke barrier door

Single axis double speed plate door

Adjust the baffle air door

Quickly open the barrier door

Bypass baffle door

Quick opening flue plug door

Balanced adjustable shrinkage hole

Denitrification barrier door

Split type adjustable shrinkage hole

Single core adjustable shrinkage hole

Desulfurization flue damper door

seal plate

Coal bunker plug-in door

Smoke isolation door

 

 

 

 




 

Previous article: slide plate gate
Next article: Smoke isolation door